FastTrack Gmail to Exchange Online Migration
Introduction
This guide is intended to walk you through enablement steps needed to be ready for a FastTrack Gmail migration through Migration Hub. After completing these steps, you will be ready to move onto Migration Hub setup and configuration.
 Prerequisites
                                Complete the following prerequisites before continuing:
- Create a subdomain to route mail to Google Workspace
- Create a subdomain for mail routing to your Google Workspace domain
- Provision Microsoft 365 mail users
- Verify Google migration administrator role assignments
- Create CSV of test mailbox to migrate (see step 10 in documentation)
Migration Endpoint Creation and Test Migration
In this task, we will walk through creating a migration endpoint as well as a test batch of at least one mailbox. Successfully migrating a mailbox through this guide validates that FastTrack migration tooling will be able to leverage the endpoint you create for migration.
- Sign in with your credentials:
                                                
- In the Migration path section:
                                                
- In the Migration type section:
                                                
- In the Prerequisites section:
                                                
- Sign in to your Google workspace account:
                                                                
- Wait for the prerequisite steps to show a green check next to each item.
 
- In the Migration endpoint section:
                                                - Note: Numbers for concurrent migrations and concurrent incremental syncs is a suggestion. You may want to lower or raise these numbers as needed. The maximum you can configure is 300 connections
 
- In the Add users section:
                                                
- In the Configuration section:
                                                
- In the Schedule section:
                                                
You will now be redirected to the Migration batches page, monitor the migration for completion. If the mailbox(es) scheduled complete successfully you are ready to move onto FastTrack Migration Hub